Wyspa: plan power during a long blackout
Demo: an invented town and real 2024 weather. Simulation only, not connected to any equipment.
Solar panels, a battery and a diesel generator cannot power every facility, so Wyspa proposes, hour by hour, which to switch off and says why.
Time
- Battery at hour end
- Diesel at hour end
- Solar
- Off now
- Next
| Part | Value |
|---|
Result
Three ways to run the same power system
| Measure | No plan (everything on) | Only priority 1 | Wyspa plan |
|---|---|---|---|
| Priority 2, share of needed energy | |||
| Priority 3, share of needed energy | |||
No plan: nothing is switched off, so in any hour the facilities need more than the system can give, the whole system shuts down, like a blown fuse. Only priority 1: priorities 2 and 3 stay off the whole time. Wyspa plan: the method under How the plan decides. All three run on the same diesel: the tank minus the diesel kept back.
Wyspa uses your overrides; the two fixed rules ignore "serve first". Excluded facilities are left out of all three.
Hour by hour
- Priority 1 served
- Priority 2 served
- Priority 3 served
- Needed by all facilities
- Solar output
- Battery charge (%, right-hand scale)
- Diesel generator
- No solar output
Power served by priority, solar output, battery charge, diesel generator output and the state of each facility for every hour.
- On
- Not in use now
- Off by the plan
- Excluded by you
- Not enough power
- Priority 1 without enough power
Hour-by-hour table
Facilities
Equipment
Charge power, discharge power and the assumed battery minimum change with the size.
An assumption, not a measured forecast error.
What happens and why
Your decision
Review, print and the diesel answer use the Wyspa plan, whatever the chart shows. The CSV holds the strategy on the chart.
Who loses power in the Wyspa plan
How much diesel is needed?
How the plan decides
- Each hour, the planner goes down the list of facilities: priority 1 first, then in list order inside a priority. A facility runs only if every facility already on still keeps power to the end of the outage in the planner's forecast. If not, it is switched off, and the planner still tries the smaller ones below it.
- The forecast is the recorded weather of those days with less sun, as set under Equipment. The plan also knows when the outage ends. The current hour uses the recorded solar output.
- Power flows in a fixed order: solar first, then the battery, then the diesel generator. Spare solar charges the battery. The generator starts only when the battery cannot cover the hour, runs at least at its minimum output, and its diesel use follows the HOMER fuel curve.
- The plan keeps no diesel or battery charge for after the outage, unless you keep diesel back under Equipment.
- The planner only proposes and explains. A person checks who loses power and decides.
Words used here
- Local power system (microgrid)
- Solar panels, a battery and a generator that power a few facilities without the main grid.
- Wyspa
- Polish for "island". A power system cut off from the main grid runs as an island.
- kW and kWh
- kW is power at one moment. kWh is energy over time: 1 kW for 1 hour is 1 kWh.
- Modelled hour
- Each step is one hour. Power values are the hour's average; battery and diesel show what is left at the end of the hour. Hours with power are totals, not one unbroken stretch.
- Assumed battery minimum
- Charge the model never takes from the battery. Assumed minimum: 10% in this demo.
- No plan (everything on)
- Nothing is switched off. If the facilities need more power than the system can give, the whole system shuts down for that hour, like a blown fuse.
Briefing: Wyspa plan (demo)
Demo: an invented town and real 2024 weather. Simulation only, not connected to any equipment.
Simulation only. Not connected to equipment. Do not use as a switching instruction.
Reviewed by (name, signature): ____________________